Delays likely – Lane closure
Works location: Slip Alpha on from Suttons Business Park
Works description: Bi-Annual works
Responsibility for works: Wokingham Borough Council
Works location: Slip Brava off at Suttons Business Park
Works description: Bi-annual works
Works location: Slip Alpha on from Bader Way
Delays likely – Traffic control (give & take)
Works location: At the junction with Rosedale Crescent
Works description: Excavate to install chamber a duct to connect to existing duct for fibre optic cable
Responsibility for works: NEOSCORP LTD
Delays likely – Traffic control (two-way signals)
Works location: 193
Works description: Reinstate carriageway TM in Carriageway. Our intention is to complete the Permanent Reinstatement in the same phase
Responsibility for works: Thames Water
Delays likely – Traffic control (Stop/Go boards)
Works location: Opposite 19
Works description: Illuminated “Height Restriction Ahead” sign no. S063 Loddon Bridge Road, Woodley – Unique ID 020004. Straighten and re-concrete leaning sign post
Delays possible – Traffic control (give & take)
Works location: Conversion at number 16
Works description: SGN to lay new service
Responsibility for works: SGN
Delays possible – Some carriageway incursion
Works location: 62
Works description: B Box Repair <33mm Cway in Carriageway.
Works location: Outside Bulmershe Leisure Centre
Works description: To excavate joint boy and 4M trench to move bus shelter by 3M
Responsibility for works: Scottish and Southern Power Distribution
Delays unlikely – Some carriageway incursion
Works location: 8
Works description: Fire Hydrant LCC Type Exchange Fway in Footway. Our intention is to complete the Permanent Reinstatement in the same phase
Delays unlikely – Traffic control (give & take)
Works location: Outside 107
Works description: Carriageway patch
Works location: 1
Works description: Service Pipe Repair <33mm Cway in Carriageway.
Works location: Outside 81
Works description: Carriageway patching
Works location: Near the junction with London Road
Works description: Excavate to install chamber and duct to connect to existing duct for fibre optic cable