Delays likely – Traffic control (two-way signals)
Works location: Twin Oaks
Works description: Reinstate carriageway. Our intention is to complete the Permanent Reinstatement in the same phase
Responsibility for works: Thames Water
Delays possible – Some carriageway incursion
Works location: 3
Works description: Water meter replacement/installation in footway
Works location: Outside 59
Works description: Hand digging only to expose existing telecoms infrastructure to provide service to a new customer
Responsibility for works: Openreach
Delays likely – Traffic control (multi-way signals)
Works location: Outside 221
Works description: Locate and excavate 1 blockage in existing duct
Works description: Remove signage and lighting installation
Responsibility for works: Wokingham Borough Council